Elevated Tank Construction and Drinking Water Network Upgrade – Tor Area

To ensure a reliable and sustainable drinking water supply, a new elevated storage tank with a total capacity of 250 m³ was constructed above Tor, in the municipality of St. Martin in Thurn. The project also included the construction of a new transport pipeline and the renewal of key distribution pipelines, significantly enhancing system reliability, operational safety, and overall network performance.

Client: Municipality of St. Martin in Badia
Period: 2018–2024
Construction cost: €676,922.48

• Feasibility study
• Submission and implementation project
• Construction management
• Safety coordination during the planning and implementation phases
• Construction accounting