On behalf of the Municipality of Pfitsch, EUT Engineering planned and delivered the comprehensive renovation of the 'Schnagge' drinking water facility, a key element of the water supply system for the village of Wiesen. The project included the recapture of two springs, construction of a collection shaft, renewal of approximately 1,250 metres of drinking water pipelines, and installation of additional empty conduits for Edyna and fibre-optic infrastructure. The existing elevated tank was extensively refurbished and technically modernised to meet current operational and safety standards.
To ensure a reliable and sustainable drinking water supply, a new elevated storage tank with a total capacity of 250 m³ was constructed above Tor, in the municipality of St. Martin in Thurn. The project also included the construction of a new transport pipeline and the renewal of key distribution pipelines, significantly enhancing system reliability, operational safety, and overall network performance.