Rockfall protection dams Frizziau
According to the hazard zone plan, parts of the ‘Frizzi Au’ landfill site in Pfatten were exposed to rockfall riskl. To mitigate this hazard, comprehensive protective measures were planned and implemented. EUT Engineering was responsible for the entire project lifecycle, from initial studies and detailed planning to safety coordination and construction management. As part of the project, more than 600 meters of protective dams and barriers were constructed, providing long-term protection for the landfill site and the surrounding areas.

Client: eco-center AG
Project duration: 2019 – 2024
• Rockfall hazard study
• Technical and economic feasibility study
• Submission project
• Implementation project
• Tender documents
• Safety coordination during the planning phase
• Geological and geotechnical reporting
• Overall construction management, surveying, measurement, and cost control
• Geological specialist construction management
• Development of additional and alternative projects
• Safety coordination during the implementation phase