
The Municipality of St. Leonhard in Passeier assessed approximately 9,000 m² of municipal roof areas for the installation of photovoltaic systems and established a priority ranking. Criteria included roof condition, exposure, ease of installation, and building energy consumption. A 32 kWp PV system was installed at the municipal depot, reducing the building’s electricity consumption by nearly 50%.



