Photovoltaic plant at the municipal depot of S. Leonardo in Passiria (BZ)

The Municipality of St. Leonhard in Passeier assessed approximately 9,000 m² of municipal roof areas for the installation of photovoltaic systems and established a priority ranking. Criteria included roof condition, exposure, ease of installation, and building energy consumption. A 32 kWp PV system was installed at the municipal depot, reducing the building’s electricity consumption by nearly 50%.

Client: Municipality of San Leonardo
Project duration: 2023
Installed power: 32kWp

• Feasibility study and priority list
• Implementation project
• Works management
• Safety coordination