Loading...
Energia rinnovabile
Idrogeno
Ingegneria civile

H2 filling station Sadobre

AUTOSTRADA DEL BRENNERO AG plans to build four hydrogen filling stations along the Brenner motorway as part of the PNRR M2C2 3.3 “Testing hydrogen for road transport” program, supporting environmental protection and the energy transition.
The Sadobre project involves the construction of a hydrogen refueling station at the Sadobre truck stop in the municipality of Freienfeld near Sterzing. The facility will be powered by gaseous hydrogen and will feature fuel pumps operating at 350 bar for heavy-duty vehicles and 700 bar for light vehicles.
The H2 facility includes:
• Trailer boxes with the corresponding supply panels
• H2 storage units for medium and high pressure
• Compressor units,
• Distribution measurement, and control units
• Cooling units
• Fuel pumps for refueling heavy and light vehicles with corresponding payment terminals
• Electrical system
• Fire water supply.

Client: A22 Brennerautobahn AG
Construction costs: approx. €14.7 million
Project duration: 2022 - 2025

• Feasibility study
• Project for technical and economic feasibility
• Tender
• Safety coordination during the planning phase
Verwandte Projekte